201 Kent Waterproofing Planterboxes

Project Description

This Project completed by EDSRING included;

  • Project Management
  • Waterproofing of 3 x Large external planter boxes at the front of the Building
  • Removal of bitumen membrane
  • Preparation of substrate by grinding and any repairs to voids and cracks.
  • Supply and install Ardex LQ92 self-levelling compound to reduce ponding in the centre of the planter boxes
  • Install fillets to junctions and penetrations.
  • Clean Out all plumbing lines and drainage in each Planter box
  • Prime and install a double layer of Ardex WPM 188 SBS bitumen sheet membrane system which has a 15 year warranty.
  • Install pressure seal to perimeter terminations.
  • Supply and install Atlantis 30 mm drainage cell and geo fabric and protection board to walls and floor of entire planter box.
  • Painting of the external faces of the Planter boxes
  • Prior to reinstallation of New Soil and Plants

Case Details

Address

201-207 Kent St, Sydney

What We Did

Waterproofing of 3 Large Planter boxes